- This topic has 22 replies, 14 voices, and was last updated 1 year, 9 months ago by Cessna172.
-
AuthorPosts
-
-
December 1, 2022 at 12:32 pm #736516HarleyvsParticipant
I ordered a Chevy Silverado in April of 2022 & it has been built & is setting in storage in Mexico, when should I expect it to leave Mexico for delivery to Norfolk, Va.?
-
December 1, 2022 at 1:55 pm #736533kevinp2469Participant
Good luck! Mine has been in storage for 4 months and still hasn’t moved.
-
December 23, 2022 at 1:44 pm #739920LikeMySilveradoParticipant
I ordered a Silverado 1500 in April 2022, canceled by GM in July 2022. Ordered a 2023 Silverado 1500 fully equipped with almost all the packages and options in July, built mid October and delivered November 3. The only items from the order were the diesel motor, Z71 4wd and color. None of the other packages or options on the order. I did not purchase it.
-
December 27, 2022 at 5:28 am #740110pmanches54Participant
It seems by the posts in here that the build and delivery problems are mostly from the trucks built south of the border. There are likely those from stateside and Canada but don’t seem to here of so many. Just curious. Mine went into production in April at the Ft. Wayne plant and was delivered mid June with only park assist missing.
-
December 27, 2022 at 10:13 am #740142grunt1bat7marParticipant
I picked up my ’22 Trail Boss Lt in August. Side sticker shows it was built in Mexico July ’22. There is just no rhyme or reason for all the delays.
-
December 28, 2022 at 9:03 am #740236TonyDParticipant
Ordered a 2022 Silverado regular cab 5.3 in April 2022. Had to change it to a 2023 in July. Truck was built October 18, 2022 in Silao Mexico, and has showed as “In the shipyard waiting for transit” ever since…
-
December 31, 2022 at 6:36 pm #740600CapitalTruckParticipant
I don’t understand how this is a viable business model. If you can’t deliver the truck as ordered let the buyer know.
-
February 8, 2023 at 2:07 pm #746095InTheRoughParticipant
Are there any dealers on this site that can estimate the build/delivery time of a ’23 Trail Boss if ordered now?
-
February 21, 2023 at 10:28 pm #748201KyleDallasParticipant
Good luck to you.
-
February 23, 2023 at 9:10 am #748430madeindetroit93Participant
I ordered a 23 Silverado Crew WT on 12/6/22. No options other than the 5.3 and 4WD. It was built in Silao on 2/3/23 and its currently at a 4300 status code….
-
February 25, 2023 at 5:32 pm #748888Cessna172Participant
I feel your pain…
My SIlverado RST was built on May 26, 2022 in Ft Wayne. There it still sits on micro-processor hold. Today is Feb 25, 2023. Nine months of event code 4D00 – awaiting parts. I consider everyday about buying another brand, but the RST is the exact truck I’m interested in.
I know that the day I purchase another brand, I’ll get a call from the Chevy dealer saying your truck arrived today unexpectedly.
So I wait along with many others.
Good luck!
-
February 26, 2023 at 7:35 am #748892WensinkParticipant
Cessna172…. I also feel Your pain… I’m on the same sinking ship…. Denali built May 28th in Ft. Wayne 4D00 ever since….Getting the dealer stock 4 bangers delivered seems to be their priority
-
February 26, 2023 at 1:23 pm #748912Cessna172Participant
Wesink, I’ve had my eye on another V8 RST at a different dealer only 30 serial numbers away from mine. That truck went to 4B00 last week as it was moved from Oxford street to the Montrose St shipping yard.
Perhaps there is some hope.
I wonder if it will still have that “new car smell”.
-
February 26, 2023 at 3:55 pm #748921WensinkParticipant
Cessna172 maybe there is light at the end of your dark tunnel. The new car smell may have a little stale scent to it lol. My last six are 544519… There is always hope I suppose.
-
February 26, 2023 at 9:37 pm #748925Cessna172Participant
Wesink,
My last six is 544059. The 544 series seems to be the ones still lingering, waiting to ship. The other truck I was looking at that just showed some movement is also a 544.
-
February 28, 2023 at 6:46 am #749170WensinkParticipant
Cessna172…. I think you solved the mystery but on a good note my truck was invoiced on 01/17/23 and the Certificate of Origin was produced on 01/30/2023…. Just crawling ever so slowly to the finish line…. But still coded at 4D00
-
February 28, 2023 at 12:00 pm #749227Cessna172Participant
Wensink… Well, holy blessed mother of surprises! My dealer called yesterday and we have an ETA! 3/30/23
Will it arrive on 3/30, probably not; but, it is finally out of 4D00.Hope you hear some good news soon.
-
March 1, 2023 at 6:46 am #749322WensinkParticipant
Cessna172… Great news !… Out of 4D00 means it’s finally out of Purgatory… Now let’s see how well the 3rd party shipper does it’s job.
-
March 1, 2023 at 9:10 am #749351frankthetankParticipant
InTheRough, I was told 6-12 weeks on a Trail Boss depending on what options you chose. I ordered mine 10/27/22 & GM accepted the order 12/20/22. If we go by the GM acceptance date, I’m in the 10th week of waiting. My truck is built, just waiting to be loaded onto the train. I ordered the 5.3L LT, premium package, dark essentials & multi-flex tailgate in summit white.
-
March 14, 2023 at 3:53 pm #751534Cessna172Participant
Just heard from my dealer – the delivery date for my RST has been moved up to 3/21. It is now located only 50 miles from me. It’s been a long ten months…
-
March 15, 2023 at 6:45 am #751624WensinkParticipant
Cessna172… My Denali delivery date is 3/23 but I’ll believe it when our trucks actually show up… It has also been a very long (14 months ordered 10 months produced ) Wait…
-
March 15, 2023 at 9:08 am #751640Cessna172Participant
Wensink – I guess time (money was probably another factor) was the great motivator to finally get these 2022 vehicles shipped to customers.
Great to hear your Denali is on its way!
-
-
AuthorPosts
- You must be logged in to reply to this topic.