- This topic has 2 replies, 3 voices, and was last updated 2 years, 11 months ago by .
Viewing 2 reply threads
Viewing 2 reply threads
- You must be logged in to reply to this topic.
In order to post or reply to comments, or manage your user settings
Not a member?
In order to post or reply to comments, or manage your user settings
What does it mean when the order status goes from in transit to delayed on an Equinox that was shown as built on 3/1?
I ran into the situation with my Equinox, purchased in January. The car was built & in transit as of December 18, 2021. Remember the Equinox is built in Mexico. The vehicle is brought to a port of entry. From there, my vehicle was placed on a transporter for delivery to the dealer. The problem came in with the transport company. There is a huge shortage of truck drivers, that it delayed my delivery by over 4 weeks. I took delivery on January 26, 2022.
I have a 2022 3500HD that was built on Nov 10th 2021 that I ordered in March of 2021 that has been sitting at the Flint Plant stuck in a transit status. It has been 5 months since it was built and over a year since it was ordered. Everyone I speak to on it tells me the same thing that I just have to wait.