Equinox order in transit/delayed status

Viewing 2 reply threads
  • Author
    Posts
    • #698643
      sophiedog3
      Participant

      What does it mean when the order status goes from in transit to delayed on an Equinox that was shown as built on 3/1?

    • #698663
      miknet
      Participant

      I ran into the situation with my Equinox, purchased in January. The car was built & in transit as of December 18, 2021. Remember the Equinox is built in Mexico. The vehicle is brought to a port of entry. From there, my vehicle was placed on a transporter for delivery to the dealer. The problem came in with the transport company. There is a huge shortage of truck drivers, that it delayed my delivery by over 4 weeks. I took delivery on January 26, 2022.

    • #698748
      Cheddar
      Participant

      I have a 2022 3500HD that was built on Nov 10th 2021 that I ordered in March of 2021 that has been sitting at the Flint Plant stuck in a transit status. It has been 5 months since it was built and over a year since it was ordered. Everyone I speak to on it tells me the same thing that I just have to wait.

Viewing 2 reply threads
  • You must be logged in to reply to this topic.

Subscribe to GM Authority

For around-the-clock GM news coverage

We'll send you one email per day with the latest GM news. It's totally free.