March 10, 2023 at 10:51 am #751002
Newbie here. I was wondering how long it’s taking for the plant at San Luis Potosi, to build the Equinox., from time ordered to VIN assigned? Thanks
-
March 10, 2023 at 10:55 am #751005
I have one that I am thinking of ordering. The dealer said around 8 weeks from order to their door was the usual.
Obviously that’s just a guesstimate and it will vary depending on your location. -
March 10, 2023 at 11:23 am #751015
I was told by the dealer 8 -12 weeks. im in Canada. my order hasn’t been built yet ,with no build date specified. It’s been 6 weeks since order number was received by dealer.
-
March 10, 2023 at 3:43 pm #751116
I was just told by Chev HQ in Canada my build date has been moved back a month, so its in Apr now. 3 months after first ordering it. And the order is still coded 3000 so the date can still be moved back further. So don’t rely on the dates the dealer gives you. I should of had my vehicle, but instead it’s being built at the time i was supposed to get it.
-
March 13, 2023 at 4:38 pm #751379
We tried to order an Iron Gray Equinox RS today, order was rejected due to that color being on constraint for the rest of the 23MY, we had to chose black
-
March 18, 2023 at 11:23 am #752277
good luck on your order. I hope you don’t run into the same issues I have.
-