mobile-menu-icon
GM Authority

Build Times

Viewing 5 reply threads
  • Author
    Posts
    • #751002
      AJP
      Participant

      Newbie here. I was wondering how long it’s taking for the plant at San Luis Potosi, to build the Equinox., from time ordered to VIN assigned? Thanks

    • #751005
      64BAwagon
      Participant

      I have one that I am thinking of ordering. The dealer said around 8 weeks from order to their door was the usual.
      Obviously that’s just a guesstimate and it will vary depending on your location.

    • #751015
      AJP
      Participant

      I was told by the dealer 8 -12 weeks. im in Canada. my order hasn’t been built yet ,with no build date specified. It’s been 6 weeks since order number was received by dealer.

    • #751116
      AJP
      Participant

      I was just told by Chev HQ in Canada my build date has been moved back a month, so its in Apr now. 3 months after first ordering it. And the order is still coded 3000 so the date can still be moved back further. So don’t rely on the dates the dealer gives you. I should of had my vehicle, but instead it’s being built at the time i was supposed to get it.

    • #751379
      64BAwagon
      Participant

      We tried to order an Iron Gray Equinox RS today, order was rejected due to that color being on constraint for the rest of the 23MY, we had to chose black

    • #752277
      AJP
      Participant

      good luck on your order. I hope you don’t run into the same issues I have.

Viewing 5 reply threads
  • You must be logged in to reply to this topic.

Subscribe to GM Authority

For around-the-clock GM news coverage

We'll send you one email per day with the latest GM news. It's totally free.