- This topic has 5 replies, 2 voices, and was last updated 1 year, 8 months ago by .
Viewing 5 reply threads
Viewing 5 reply threads
- You must be logged in to reply to this topic.
In order to post or reply to comments, or manage your user settings
Not a member?
In order to post or reply to comments, or manage your user settings
Newbie here. I was wondering how long it’s taking for the plant at San Luis Potosi, to build the Equinox., from time ordered to VIN assigned? Thanks
I have one that I am thinking of ordering. The dealer said around 8 weeks from order to their door was the usual.
Obviously that’s just a guesstimate and it will vary depending on your location.
I was told by the dealer 8 -12 weeks. im in Canada. my order hasn’t been built yet ,with no build date specified. It’s been 6 weeks since order number was received by dealer.
I was just told by Chev HQ in Canada my build date has been moved back a month, so its in Apr now. 3 months after first ordering it. And the order is still coded 3000 so the date can still be moved back further. So don’t rely on the dates the dealer gives you. I should of had my vehicle, but instead it’s being built at the time i was supposed to get it.
We tried to order an Iron Gray Equinox RS today, order was rejected due to that color being on constraint for the rest of the 23MY, we had to chose black
good luck on your order. I hope you don’t run into the same issues I have.