2500HD Diesel Denali how long does it really take

Viewing 10 reply threads
  • Author
    Posts
    • #640604
      twhelan61
      Participant

      I place initial order 1/12/21 was given an order number the following Thursday 1/21/21 which concides with what I’ve read here regarding orders every other Thursday. 2/18/21 will be 4 weeks, according to the online chat I’m stuck at 1100 preliminary order accepted, how long am I expected to stay their before factory does anything. Does anybody have any infomation as to how long an order really takes. I only ordered because there is no stock around with the Hunter Metallic. I’m seeing info on random websites that actual order to delivery can take up to 23-25 weeks. Was my dealer blowing smoke up my butt when he said 10 to 12 weeks but closer to 12 weeks?

    • #640626
      twhelan61
      Participant

      Went to gmc online chat today and I think I got promoted to event code 2000 this is message I got.

      Your order for your 2021 GMC Sierra Crew Cab 4WD has been accepted by the plant. GMC has now accepted your order in the system but does not have an assigned targeted production week. For now, you may continue to contact us or you may call your selling dealership for further information regarding timing of production.

      • #642263
        doug888
        Participant

        TW, times are much different now, but ordering an Acadia in February, 2020 …. I took delivery in 43 days from Spring Hill, TN.

        My order was 5000 as of March 24
        My order was 4800 as of March 20
        My order was 4200 as of March 14
        My order was 4150 as of March 12.
        My order was 4000 as of March 12
        My order was 3800 as of March 12
        My Acadia was built on March 11
        My order was 3400 as of Feb 21
        My order was 3300 as of Feb 13
        My order was 3100 as of Feb 13
        My order was 3000 as of Feb 11
        My order was 1100 on Feb 10

    • #642732
      rustedtool
      Participant

      I ordered my 2021 Sierra 3500HD SLT DMax on Dec 14… been checking online for status the last few weeks – getting the same message “order accepted, no Target Production Week yet, please check back later”. Coming up on 11 weeks. Wish I could get some good news soon.

    • #642786
      TexasBlue7
      Participant

      I tried to post about my order, but it doesn’t seem to load. We have ordered a 2021 GMC 3500HD Sierra Denali standard bed and it has an projected production week of 3/29/21. No one seems to be able to answer what I think is a simple question. That question is, “Once the production week is confirmed, what is the average delivery time to a dealer in Texas after the production date?” I know there are lots of factors in getting the truck in production, but would think someone at GMC would know the average shipping time once the truck is built. Thanks

    • #642797
      rustedtool
      Participant

      TexasBlue7…. when did you place your order?

    • #642927
      twhelan61
      Participant

      I think I’m at event code 3300 order selected, scheduled for production.

      This was the Feb 17 message on the GM chat. Your order # has been accepted by GM and on the line for production. The target production week is on 3/15/21

      I checked again today and it was the same message production week is 3/15

      So that puts me at approx. 8 weeks from order to production, if factory holds true to the 3/15 date, I’m hoping for a mid April delivery that would put me at 12 weeks till delivery, which is what the dealer told me originally. And hopefully 0 percent on Denali’s with GM trying to get tax refund out of everyone’s pocket.

      I wish their was a better way to follow, I think the dealer does the same thing, but not sure.

    • #644149
      djmarceau
      Participant

      I ordered my GMC 3500HD Denali on 12/17/20. As of 3/4 it was at 3100 (order available for sequence) level. The dealership said they expect delivery by the end of March or 1st week of April. That would put it around 13 weeks if you take out the holiday shutdown. The dealer estimated 12-14 weeks when I placed the order. Given the microchip shortage everyone is dealing with I wouldn’t be surprised if it takes a little longer.

    • #648713
      DansDenali
      Participant

      New member here awaiting my 21 Sierra Denali HD and was told that it is 3300 and scheduled to be built next week. How long does it usually take to be shipped?

      I have a 19 and this will be my 4th new one.

      Dan

    • #648714
      djmarceau
      Participant

      My 3500 HD Denali was at 3100 on March 4th and I picked it up from the dealership on March 25th. So only 3 weeks in total.

      • #653082
        Krp88
        Participant

        Anyone still waiting on delivery? Going on 8 weeks with nothing yet. (ordered 3/10/21). Haven’t heard from the dealer other than the truck as been accepted. Hearing 12 weeks is the new normal. Does that still ring true for 2021 Sierra 2500HD?

    • #648834
      broke2ride
      Participant

      Ordered 3500 Denali 2/12 It was built 3/25 and apparently setting in a Flint parking lot stuck at event code 3400 and nobody will tell me why.

    • #654749
      Z15
      Participant

      These are hard times for new vehicle buyers. With all the covid closing it has strained the supply channels and logistics nationwide. The plants were put on hiatus for well over a month.

      • This reply was modified 3 years, 10 months ago by Z15.
Viewing 10 reply threads
  • You must be logged in to reply to this topic.

Subscribe to GM Authority

For around-the-clock GM news coverage

We'll send you one email per day with the latest GM news. It's totally free.