April 4, 2022 at 9:04 am
#698748
Participant
I have a 2022 3500HD that was built on Nov 10th 2021 that I ordered in March of 2021 that has been sitting at the Flint Plant stuck in a transit status. It has been 5 months since it was built and over a year since it was ordered. Everyone I speak to on it tells me the same thing that I just have to wait.