It was set to be built the week of the 7th of March. However, it wasn’t completed for another week or so due to the bedliner. THe bedliner is sprayed away from the assembly line, after the truck is actually built. So, with that, and the quality assurance part of the build completed, the truck has been bayed since 3/22/22, awaiting transport.